Introduction
Most Australian buildings are designed to comply with the Deemed-to-Satisfy (DTS) Provisions of the National Construction Code (NCC). Many projects, however, involve site constraints, existing conditions, innovative systems or operational needs that make full DTS compliance impractical. In these situations, a fire engineered Performance Solution can demonstrate that the building still meets the NCC Performance Requirements.
This article explains when a fire engineered Performance Solution is typically needed, how the NCC process works, and what building owners, designers and certifiers should consider before choosing this pathway. References are to NCC 2022 Volume One; confirm clause numbering against NCC 2025 where it has been adopted in your jurisdiction.
What Is a Fire Engineered Performance Solution?
The NCC offers two pathways to compliance: a DTS Solution, which follows the prescriptive DTS Provisions, and a Performance Solution, which shows compliance with the Performance Requirements by other means. A building can also combine both, using DTS Provisions for most of the design and Performance Solutions for specific departures.
A fire engineered Performance Solution uses recognised fire engineering principles, analysis and, where needed, modelling to show that the relevant fire safety Performance Requirements are satisfied. It is usually documented in a Fire Engineering Report (FER).
The NCC Performance Requirements for fire safety focus on:
- Safe evacuation of occupants
- Support for fire brigade intervention
- Limiting fire spread within the building and to other property
Property protection and business continuity are not NCC requirements. Where a client wants them addressed, they can be added to the design brief as additional project objectives.
NCC Assessment Methods
A Performance Solution must be verified using one or more of the Assessment Methods permitted by the NCC (clause A2G2(2) in NCC 2022):
- Evidence of Suitability – for example, test reports or certificates showing that a material, product or system meets a Performance Requirement
- Verification Methods – including those in the NCC or others accepted by the appropriate authority
- Expert Judgement – the judgement of a person with the qualifications and experience to determine whether a Performance Solution complies
- Comparison with the DTS Provisions – showing that the Performance Solution is at least equivalent to the DTS Provisions
Approval processes and documentation expectations vary between states, territories and certifiers, so they should be confirmed early in the design.
When Is a Performance Solution Typically Needed?
A Performance Solution is needed whenever part of a building does not comply with the relevant DTS Provisions and the design team still needs to demonstrate compliance with the Performance Requirements. Common triggers are described below.
1. Departures from the Deemed-to-Satisfy Provisions
Any departure from the DTS fire safety provisions will require a Performance Solution unless the design is changed. Typical examples include:
- Extended travel distances or fewer exits than the DTS Provisions allow, often in large warehouses, retail and open-plan offices
- Larger fire compartments or reduced separation between parts of a building
- Variations to Fire Resistance Levels (FRLs) for structural or separating elements
- Alternative fire-resisting construction or passive protection details not covered by the DTS Provisions
- Variations to fire services, such as alternative hydrant coverage, booster locations or sprinkler arrangements
In each case, the Performance Solution shows how the proposed design satisfies the relevant Performance Requirements, either directly or by comparison with the DTS Provisions.
2. Complex or Unusual Buildings
The more complex a building, the less likely every element fits within the DTS Provisions. Performance Solutions are common for:
- Mixed-use developments combining residential, retail, commercial and car parking with interconnected spaces
- Large open-plan buildings such as distribution centres, exhibition halls and sports facilities
- Atria and interconnecting voids, where smoke movement and evacuation paths need specific analysis
- Special-purpose facilities such as laboratories, data centres and industrial sites with unusual hazards
3. Existing and Heritage Buildings
Alterations, additions and changes of use in existing buildings often conflict with current DTS Provisions because of fixed structure, legacy construction or heritage constraints. Performance Solutions are commonly used to:
- Retain existing stairs, corridors or door widths with compensating measures such as improved detection, sprinkler protection or occupant warning
- Limit the impact of upgrades on significant heritage fabric
- Support staged upgrades that progressively improve fire safety
Management procedures can support these measures but are generally not accepted as the primary means of compliance. Requirements for upgrading existing buildings vary by jurisdiction and should be confirmed with the certifier.
4. New Materials and Systems
Where the DTS Provisions do not yet cover a material or system, a Performance Solution may be needed. Examples include mass timber and hybrid structures, some façade systems, and bespoke smoke control or detection arrangements. These solutions typically rely on test evidence, recognised guidance and modelling.
5. Operational Requirements
Some buildings have operational needs that conflict with the DTS Provisions, such as:
- Shopping centres seeking open malls without extensive physical separation
- Warehouses with high-bay racking or storage arrangements outside standard assumptions
- Secure facilities where egress must be balanced against security controls
A Performance Solution allows these needs to be assessed explicitly, with mitigation measures defined to suit the actual risk.
Common Issues and Typical Objectives
| Issue | Typical objective of the Performance Solution |
|---|---|
| Extended travel distances or reduced exits | Show occupants can evacuate before conditions become untenable |
| Atria and large voids | Control smoke spread and maintain tenable conditions for evacuation and fire brigade operations |
| Varied FRLs or construction | Show structural stability and compartmentation are maintained for the required duration |
| Alternative smoke control | Verify smoke layer height, temperature and visibility remain within acceptance criteria |
| Fire services variations | Show fire brigade access and firefighting water supply remain adequate |
| Heritage constraints | Achieve compliance while limiting impact on heritage fabric |
The Performance Solution Process
NCC 2022 introduced a defined process for developing a Performance Solution (clause A2G2(4)). In practice, a fire engineered Performance Solution generally follows the methodology of the Australian Fire Engineering Guidelines (AFEG):
- Prepare a Performance-Based Design Brief (PBDB) in consultation with the relevant stakeholders, including the certifier and, where required, the fire authority. The PBDB defines the DTS departures, the relevant Performance Requirements, the Assessment Methods, design fire scenarios and acceptance criteria.
- Carry out the analysis agreed in the PBDB. This may include hand calculations, smoke modelling such as computational fluid dynamics (CFD), evacuation modelling or structural fire analysis.
- Evaluate the results against the acceptance criteria in the PBDB.
- Prepare the final report, usually a Fire Engineering Report, setting out the assumptions, analysis, results, conclusions and any conditions such as required fire safety measures and maintenance.
The Fire Engineering Report forms part of the approval documentation and should be kept with the building records, as its conditions often apply for the life of the building.
Who Is Involved?
- Design team – identifies DTS departures and decides with the client whether to redesign or pursue a Performance Solution
- Fire safety engineer – prepares the PBDB, analysis and Fire Engineering Report
- Building certifier or surveyor – assesses whether the Performance Solution complies with the NCC
- Fire authority – may review or comment on the Performance Solution. In NSW, consultation with Fire and Rescue NSW is a regulated step for many fire safety Performance Solutions; check current requirements for your project.
- Building owner – accepts the cost, program and ongoing obligations, such as maintenance of fire safety measures
When a Performance Solution May Not Be the Best Option
- A simple DTS-compliant change exists – minor layout or specification changes may be cheaper and faster
- The program is too tight – the PBDB, analysis and consultation take time and cannot be rushed without risk
- The departure is too large – where analysis shows safety cannot be maintained even with mitigation
- Stakeholders will not support it – where the certifier or fire authority prefers DTS compliance for a specific issue
Key Takeaways
- A fire engineered Performance Solution is needed when a design departs from the DTS Provisions but must still meet the NCC Performance Requirements.
- It must be verified using the NCC Assessment Methods: Evidence of Suitability, Verification Methods, Expert Judgement or Comparison with the DTS Provisions.
- The process starts with a Performance-Based Design Brief agreed with stakeholders and ends with a Fire Engineering Report.
- Requirements vary by jurisdiction, so engage the certifier and, where required, the fire authority early.
- Not every issue needs a Performance Solution; sometimes a small design change is the better option.
How Quench Fire Engineers Can Help
Quench Fire Engineers provides fire safety engineering services across Australia, delivering practical, compliant and cost-effective solutions for commercial, residential, industrial, healthcare and mixed-use developments.
Our services include:
- Fire Engineering Reports and Performance Solutions
- Performance-Based Design Briefs
- Fire Safety Strategies
- Fire Sprinkler and Drencher System Design
- Fire Hydrant and Ring Main Design
- Fire Authority Consultation
- Peer Review and Certification
- Building Notices and Orders
- Expert Witness Reports
To discuss whether your project needs a Performance Solution, contact our team or call +61 497 100 066.